Most concrete slab failures start underneath the concrete. If the ground below is soft, uneven or poorly compacted, even the best ready mix will crack and sink. Whether you are building a garage floor, a driveway, a garden room base or an extension floor, preparing a proper sub-base is the most important job before the concrete arrives.
What Is a Sub-Base?
The sub-base is a layer of compacted granular material, usually MOT Type 1 crushed stone, laid between the natural ground and the concrete slab. It spreads loads evenly, gives a firm, level surface to pour onto, and helps with drainage.
Step 1: Dig Out to the Right Depth
Remove turf, topsoil and any soft or organic material. The total excavation depth depends on the use of the slab and your ground conditions, but it must allow for the sub-base layer, any sand blinding or membrane, and the slab thickness itself. Driveways and garage floors usually need a deeper build-up than a small shed base. If you are unsure, follow your designer’s or Building Control’s guidance.
Step 2: Check the Formation Level
The bottom of the excavation, the formation, should be firm and roughly level. Dig out and replace any soft spots. On London clay, avoid leaving the formation exposed to rain or drying sun for long periods, as clay can soften or shrink.
Step 3: Lay and Compact MOT Type 1 in Layers
- Spread the stone in layers rather than all at once, so each layer can be compacted properly.
- Compact each layer with a plate compactor or roller until it is firm and does not move underfoot.
- Check levels and falls as you go, especially for driveways and patios that must drain water away from buildings.
Step 4: Blind the Surface (If Needed)
A thin layer of sand blinding can fill gaps in the stone and protect a damp-proof membrane from being punctured.
Step 5: Add a Damp-Proof Membrane (Internal Slabs)
For internal floors, such as extensions or garage floors, a polythene damp-proof membrane (DPM) is normally laid over the blinded sub-base to stop ground moisture rising into the slab. Lap and tape the joints and turn the membrane up at the edges where required.
Step 6: Formwork and Reinforcement
Fix timber or steel formwork securely to the correct height. If your design includes steel mesh or rebar, place it on spacers or chairs so it sits at the correct depth within the slab. Our guide to steel mesh vs rebar explains the options.
Common Sub-Base Mistakes
- Laying the stone in one thick layer and compacting only the top
- Pouring onto soft, wet or frozen ground
- Leaving organic material or tree roots under the slab
- Forgetting falls on external slabs
- Not checking that the finished level matches doors, drains and DPCs
Ready to Pour?
Once your sub-base is ready, METRO Readymix can deliver the right grade of ready mix concrete or volumetric concrete, and a line pump if the slab is away from the road. See also preparing your site before delivery. Call 020 8129 0605 or request a free quote.
Need Concrete Delivered in London?
Ready mix, volumetric concrete and pump hire. Tell us your postcode, volume and date for a fast, free quote.