UK summers are getting warmer, and hot, sunny or windy weather changes how concrete behaves. It sets faster, loses moisture quickly and is more likely to develop surface cracks. With a little planning, you can still get a strong, good-looking result.
What Heat Does to Concrete
- Faster setting: less time to place, level and finish.
- Rapid evaporation: the surface dries out, causing plastic shrinkage cracks.
- Lower long-term strength: if the concrete dries before it has cured.
- Temptation to add water: which weakens the mix.
Before the Pour
- Book an early slot. Early morning pours avoid the hottest part of the day.
- Have everything ready. Formwork, reinforcement, tools and enough people should be in place before the truck arrives.
- Dampen the sub-base and formwork (without leaving puddles) so they do not suck water out of the concrete.
- Prepare shade and windbreaks for exposed sites.
- Ask about the mix. Your supplier can advise on a suitable slump class or admixture so you do not need to add water on site.
During the Pour
- Place and level the concrete without delays. A concrete pump speeds this up on larger jobs.
- Do not add extra water to make it easier to work.
- Finish in sections if the area is large, keeping the working edge fresh.
Curing in Hot Weather
Curing matters most in summer. Start as soon as the surface can be covered without marking it:
- Cover with polythene sheets or damp hessian.
- Use a curing compound if specified.
- Keep the concrete damp for several days and avoid letting it dry out in direct sun and wind.
See our guides on how long concrete takes to cure and why concrete cracks.
Is Volumetric Better in Summer?
Volumetric concrete is mixed on site, so each batch is fresh when it is placed. This can help on hot days, long pours or sites where the pace of work is uncertain.
Plan Your Summer Pour
METRO Readymix supplies concrete across London all year round. Book an early slot and we will help you choose the right mix for the conditions.
Need Concrete Delivered in London?
Ready mix, volumetric concrete and pump hire. Tell us your postcode, volume and date for a fast, free quote.